Case Study: Offshore Shutdown Support 🛠️

Client Needs A Northeast U.S.-based offshore operation required immediate access to high-force flange spreading tools to support a critical shutdown. The tools needed to be job-ready within 24 hours to avoid delays in disassembly and inspection procedures. This included the most recent test data, the latest maintenance documentation, and the current calibration certificate for the pressure gauges. Solution Delivered Two Hydraulic Twin Flange Spreading Tool Kits were mobilized and dispatched within the required lead time. Each kit was engineered to deliver up to 50 tons of spreading force when used in tandem—ideal for high-integrity flange separation in offshore environments. Each rental kit included: - 🔩 Pair of 25 Ton Step Wedge Flange Spreaders - 💧 Sealed Bladder 10K psi Dual Port Hydraulic Pump - 🧵 Dual Hydraulic Hoses - 📊 Calibrated Pressure Gauges - 🧱 Safety Blocks & Step Blocks - 🛡️ Safety Lanyard - 🧳 Pelican Case with Wheels - 📄 Calibration Certificates & Test Records Deployment Highlights - Quantity Supplied: 2 complete kits - Purpose: Offshore shutdown operations - Lead Time:** 24 hours from request to delivery - Shipped with Next Day Service Outcome: The rapid deployment enabled the client’s field team to execute flange separation safely and efficiently, maintaining schedule integrity and minimizing downtime. All equipment arrived calibrated, certified, and packaged for immediate use in offshore conditions.

Location

Reviews (0)