(48) 6" Anomaly Cut Outs
Complete pigging/purging activities, excavation, cut outs, tie ins, coating, and backfill on (48) anomalies stretching from Artesia, NM to El Paso, TX during a 4 day critical outage between two refineries. Locations ranged from inside the city limits of Artesia to the city limits of El Paso. All work completed safely and on schedule.
Keywords
Anomaly, cut outs, welding, tie ins