Pipeline Construction: Suction and Discharge Pipelines
Complete construction of new suction and discharge pipelines required for a new compressor station. Suction line totaled ~3.5 miles of 20" SDR 11 HDPE including (4) cased road crossings (30" HDD's), tie ins to (3) existing CTB's, hot tie ins to 1-16" poly line, and numerous valve settings. Discharge line totaled ~7,500LF of 12" steel including 1-HDD (~350LF), 1-20" on 20" hot tap, and 12"x16" launcher/receiver fabrication and installation. Arguijo Corp. completed both projects simultaneously, completing both projects safely and on schedule.