Gas Processing West of Orla, TX - Central Gathering Facility
I. Scope of Work Gas Processing Services, consisting of: - (5) Skid Mounted 65 Ton Mechanical Refrigeration Units (MRU) with NGL Stabilizers - (5) Skid Mounted 18,000 gallon NGL Storage Tanks with unloading bulkhead(s) - Full Operations & Maintenance. II. Contract Type Two (2) - 12 Month Term Service/Rental Contracts III. Overview - Torrent provided and delivered a full complement of gas processing equipment and services. - Torrent’s equipment and services allowed our customer the flexibility to scale and proceed with early takeaway as more permanent infrastructure was eventually constructed and set. - Processed ~23 MMscfd of 1430 Btu gas as well as dehydrated to less than 5#/MMscfd to meet the hydrocarbon dewpoint spec in order to sell gas to an existing pipeline using our skid mounted TRU-65 MRUs. - Used the conditioned gas to provide the fuel to three (3) Cat 3516's. IV. Equipment included: • ASME Code Equipment • PLC Controlled Automated Process • Design Basis for Broad Operating Ranges • Robust Equipment for Improved Run-time