Pipeline Construction: 10" Steel Lateral
Lay and tie in approx. 2,700LF of 10" steel through an existing oilfield. Work included all mainline construction, launcher/receiver installation, one pipeline corridor HDD crossing, hydro testing, meter run setting/fabrication, and post-weld heat treatments on all hot tie ins. Finish work included in-house painting, and dirt work.
Keywords
Pipeline, welding, tie ins, ditching